Home Additions in Hinsdale, IL.
Honest home additions for Hinsdale, IL homeowners. Same team, same project manager, same name on every invoice - from demo day through final walkthrough.
- 15+years of combined crew experience
- 2-yrwritten warranty
- five-star Google reviews
- Freein-home estimate visit
- 15+ Years Combined crew experience
- Licensed & Insured $2M general liability
- 2-Year Warranty Written, on every project
- ★★★★★ on Google five-star verified reviews
Home Additions planned for how Hinsdale homeowners live.
In Hinsdale, the size of an addition is not decided by a sketch. The village’s addition paperwork asks for architectural plans with floor area ratio overlays, and its zoning code limits bulk and density. We would rather start there with you than redraw a dream room later.
Our work, honestly
ADS has no finished home addition in our portfolio yet, so this page will not show a photo we did not build. Our nearest structural job is a Lombard house where we moved a stair and changed the floor plan of the whole level. For Hinsdale, what we offer is the village rulebook and a plan built around it.
Step one: the pre-plan review
The village publishes an Application for Pre-Plan Review for residential property. It asks for an original plat of survey and for whether the home is older than 50 years or in the Robbins Park Historic District. We would ask for it at the start and design to the answer, and we would check with the village at 630-789-7030 what it returns for your lot.
What a room addition permit involves
Additions are on the village’s list of work that needs a permit. The village’s Single Family Addition information sheet lists what to submit:
- a plat of survey with the proposed addition drawn to scale and its distance from property lines and other structures;
- stamped architectural plans with floor area ratio overlays at the same scale as the plan view;
- an application for a Certificate of Zoning Compliance;
- stamped civil engineering drawings if the Village Engineer requires them or the work disturbs over 2,500 square feet, with a stormwater permit at that size;
- Flagg Creek Sanitary District’s approval letter, plus a certified tree plan and an Abutting Neighbor Contact form for additions of 600 square feet or more;
- a general contractor registered with the village.
Once the plans are approved you build to them, and a change needs village approval first. Every permit is inspected, from footing and foundation through framing and final.
Historic houses and the bulk rules
Some Hinsdale houses have a way around the usual limits. For a home built before January 1, 1930, the village’s zoning amendment leaves the basement and attic out of the allowable floor area count, for the existing house and the new addition. The village also keeps a Historically Significant Structures Property List. A house on it, in the R-1 through R-4 single-family districts, may qualify for alternative bulk zoning when it is adding on. The village says that can include waiving the FAR and height limits, reduced setbacks and more lot coverage, through an expedited process instead of the full variation process.
Landmarks work differently. A designated landmark, and a building in a historic district, is reviewed by the Historic Preservation Commission before any alteration or other change to its exterior appearance, and an addition changes the exterior. The Commission’s decision is binding on landmarks and advisory for other buildings in a district. A denial can be appealed to the Village Board within 15 days. The village also names downtown Hinsdale and Robbins Park as areas with extra requirements.
How we would plan your addition
- Free in-home estimate, with measurements of the house and the lot.
- A pre-plan review request to the village before design starts.
- Free design consultation with a 3D plan.
- Itemized written estimate.
- Permit help and build with one project manager, then a 2-year written workmanship warranty.
ADS is a family-owned company led by its owner, Brian Kungurov, with 15 years of experience and more than 100 rooms remodeled. We are licensed and insured. Zoning rules change, so confirm the current numbers with the village at 630-789-7030. Then book your free in-home estimate and we will measure what your lot allows.
How ADS builds an addition: zoning check, engineered drawings, permits, footings and roof tie-in, and the schedule you get in writing.
Home Additions projects & process Full home additions details Remodeling permits in Hinsdale
What Hinsdale homeowners get when they hire ADS.
The kind of craft we'd bring to your Hinsdale home.
Three steps from first call to final walkthrough.
Free in-home estimate
We drive to your Hinsdale home, measure the space, and listen. Written scope usually within 48 hours of the visit.
Detailed written quote
Materials, finishes, schedule - priced in person, line by line, in writing. You see where every dollar goes before you sign.
Build & final walk
Our team runs the agreed schedule. Punch-list walkthrough, then 2-year written warranty kicks in.
Book your Hinsdale visit
We respond to most inquiries within 2 hours on business days. Estimate visit is free, no pressure to sign that day.
Four guarantees we put in writing - before any work begins.
Most contractor horror stories trace back to four broken promises. We close all four in our contract, not in marketing.
2-Year Workmanship Warranty
Every joint, tile, fixture, and finish is backed for two full years. If our build fails, we come back and fix it - no charge, no debate.
Free On-Site Estimates
We assess your project in person and put the estimate in writing - line by line, free, no obligation. If anything changes on site, you hear it from us first, with numbers.
Fully Licensed & Insured
Illinois-licensed contractor, $2M general liability, workers' comp on every crew member. We bring proof of insurance before we bring tools.
One Team Accountable
One accountable team from demo day to final walkthrough. Specialty trades work under our supervision, so there is no scheduling chaos and no "the other guys did that part."
Get your free home additions estimate in Hinsdale
We call or text back within 2 business hours, then measure at your Hinsdale home and price it in writing. No fees, no hard sell.
- Free on-site visit & written estimate
- Itemized written estimate before work starts
- Licensed & insured · 2-year warranty
Prefer to talk? (224) 278-8533
Home Additions near Hinsdale.
What else we build in Hinsdale, IL.
Five questions every homeowner asks first.
Plain answers - the kind we'd give a neighbor over coffee, not the ones written for a brochure.
Have a different question? Ask during your free estimate →-
How much does a typical kitchen or bathroom remodel cost?
It depends on the room's size, whether the layout changes, the materials you choose and any structural, plumbing or electrical work behind the walls. We don't publish price ranges because no two homes are alike. After a free in-home visit we measure, talk through what you want and send an itemized written estimate, so you see every line before signing anything.
-
How long will my project take?
A bathroom is usually 3–5 weeks from demo to final walkthrough. A standard kitchen runs 6–8 weeks. Basement finishes are 5–8 weeks. We give you a written schedule before we start - and one project lead coordinates every trade, so the schedule doesn't stall between steps.
-
Do you handle the permits and inspections?
Yes - every time. We pull the permits, schedule the inspections, and meet with the inspectors. You don't deal with the village. We handle Buffalo Grove, Arlington Heights, Lombard, Glen Ellyn, Wheaton, and the rest of our service area.
-
Can we live in the house during the remodel?
Almost always, yes. We seal off the work zone with plastic, set up a temporary kitchen if we're remodeling yours, vacuum daily, and do a deep clean at the end. Most clients stay in the home for the full project - we plan the sequence around your daily life.
-
How do payments work?
A small deposit at signing, then progress payments tied to milestones (rough-in complete, drywall complete, final walkthrough). You never pre-pay for work that hasn't started. Final payment is only released after you sign off on the final walkthrough - not before.
