Home Additions in Riverwoods, IL.
Honest home additions for Riverwoods, IL homeowners. Same team, same project manager, same name on every invoice - from demo day through final walkthrough.
- 15+years of combined crew experience
- 2-yrwritten warranty
- five-star Google reviews
- Freein-home estimate visit
- 15+ Years Combined crew experience
- Licensed & Insured $2M general liability
- 2-Year Warranty Written, on every project
- ★★★★★ on Google five-star verified reviews
Home Additions planned for how Riverwoods homeowners live.
Where would the new room go, and which trees are in the way? In Riverwoods that second question comes up early. The village asks for site documents with an addition’s building permit, so the first drawings show the lot, the woodland and the street before they show the new floor plan.
What we have built, and what we have not
Our portfolio has no home addition yet, in Riverwoods or anywhere else, so you will not see an addition photo on this page. The closest work we can show adds living space without adding footprint. In a Chicago attic conversion an unused attic with bare floor boards became a finished room with a new stair opening, oak details in the dormers and built-ins along the knee walls. In Buffalo Grove we framed and finished a basement office. If your lot makes an addition hard, those are options worth comparing at the first visit.
The submittal list for an addition
For new homes and additions, Riverwoods asks for more than the standard permit form. Along with the building permit application, the village lists:
- a tree removal permit application with an inventory of trees and shrubs from 1.5 inches in diameter at breast height within 40 feet of the construction limits
- the Lake County Wetland Inventory Map, the Special Flood Hazard Area Map and the Zoning Map, each marked with your property
- a site development plan and architectural drawings, three copies each
- a dated video of the street, shoulders, ditches and culverts along or within 100 feet of the property
- a completed site development checklist and, where it applies, a watershed development permit application
Trees around the footprint
The tree survey covers regulated trees from 1.5 to 6 inches at least 20 feet past the construction limits, and trees 6 inches and up at least 40 feet past them. Each protected tree gets a chain-link fence at its critical root zone, a circle with a radius of one foot for every inch of trunk diameter. The construction area gets its own fence, at least 6 feet high and 10 feet from any disturbed ground. No equipment or materials may sit outside the fencing, and a parcel may not lose more than 20% of its protected woodland.
The order of the work
The Village Engineer and the Village Ecologist review the site plan first. After approval the village can issue a Site Preparation Permit, which covers a short list of preparation work, such as tree and perimeter fencing, erosion control, a construction driveway, utility shutoffs and the dumpster. Once that work passes their site inspection, the building permit can be issued. Before occupancy, every development also provides a Woodland/Tree Protection and Landscaping Plan.
Debris and water
An addition or renovation over 1,500 square feet of gross floor area needs a debris diversion plan, and plan review does not start until it is filed. At least 75% of the debris has to stay out of landfills, with hauler receipts filed before the final inspection. If the house sits in a mapped floodplain, an Elevation Certificate and floodplain rules come into play, so we check the map before design.
How we would plan it
- Free in-home estimate, with measurements of the house and a walk around the lot.
- A look at the village maps and the trees near the planned footprint.
- Free design consultation with a 3D plan.
- Itemized written estimate.
- Help with the permit documents, one project manager through the build and a 2-year written workmanship warranty.
ADS is a family-owned company led by its owner, Brian Kungurov, with 15 years of experience and more than 100 rooms remodeled. Requirements can change, so confirm the current list with the Riverwoods Building Department, then book your free in-home estimate.
How ADS builds an addition: zoning check, engineered drawings, permits, footings and roof tie-in, and the schedule you get in writing.
Home Additions projects & process Full home additions details Remodeling permits in Riverwoods
What Riverwoods homeowners get when they hire ADS.
The kind of craft we'd bring to your Riverwoods home.
Three steps from first call to final walkthrough.
Free in-home estimate
We drive to your Riverwoods home, measure the space, and listen. Written scope usually within 48 hours of the visit.
Detailed written quote
Materials, finishes, schedule - priced in person, line by line, in writing. You see where every dollar goes before you sign.
Build & final walk
Our team runs the agreed schedule. Punch-list walkthrough, then 2-year written warranty kicks in.
Book your Riverwoods visit
We respond to most inquiries within 2 hours on business days. Estimate visit is free, no pressure to sign that day.
Four guarantees we put in writing - before any work begins.
Most contractor horror stories trace back to four broken promises. We close all four in our contract, not in marketing.
2-Year Workmanship Warranty
Every joint, tile, fixture, and finish is backed for two full years. If our build fails, we come back and fix it - no charge, no debate.
Free On-Site Estimates
We assess your project in person and put the estimate in writing - line by line, free, no obligation. If anything changes on site, you hear it from us first, with numbers.
Fully Licensed & Insured
Illinois-licensed contractor, $2M general liability, workers' comp on every crew member. We bring proof of insurance before we bring tools.
One Team Accountable
One accountable team from demo day to final walkthrough. Specialty trades work under our supervision, so there is no scheduling chaos and no "the other guys did that part."
Get your free home additions estimate in Riverwoods
We call or text back within 2 business hours, then measure at your Riverwoods home and price it in writing. No fees, no hard sell.
- Free on-site visit & written estimate
- Itemized written estimate before work starts
- Licensed & insured · 2-year warranty
Prefer to talk? (224) 278-8533
Home Additions near Riverwoods.
Five questions every homeowner asks first.
Plain answers - the kind we'd give a neighbor over coffee, not the ones written for a brochure.
Have a different question? Ask during your free estimate →-
How much does a typical kitchen or bathroom remodel cost?
It depends on the room's size, whether the layout changes, the materials you choose and any structural, plumbing or electrical work behind the walls. We don't publish price ranges because no two homes are alike. After a free in-home visit we measure, talk through what you want and send an itemized written estimate, so you see every line before signing anything.
-
How long will my project take?
A bathroom is usually 3–5 weeks from demo to final walkthrough. A standard kitchen runs 6–8 weeks. Basement finishes are 5–8 weeks. We give you a written schedule before we start - and one project lead coordinates every trade, so the schedule doesn't stall between steps.
-
Do you handle the permits and inspections?
Yes - every time. We pull the permits, schedule the inspections, and meet with the inspectors. You don't deal with the village. We handle Buffalo Grove, Arlington Heights, Lombard, Glen Ellyn, Wheaton, and the rest of our service area.
-
Can we live in the house during the remodel?
Almost always, yes. We seal off the work zone with plastic, set up a temporary kitchen if we're remodeling yours, vacuum daily, and do a deep clean at the end. Most clients stay in the home for the full project - we plan the sequence around your daily life.
-
How do payments work?
A small deposit at signing, then progress payments tied to milestones (rough-in complete, drywall complete, final walkthrough). You never pre-pay for work that hasn't started. Final payment is only released after you sign off on the final walkthrough - not before.
