How to choose a remodeling contractor.

The 10 questions that separate a solid crew from an expensive mistake - ask them at every single bid. No email required: read it, print it, take it with you.

Will the quote be itemized, in writing?

A good answer

Look for separate line items for labor, materials, and any allowances. A clear written scope gives you something real to compare when bids differ. A single lump sum sent by text leaves too much open to interpretation.

How ADS answers

After the visit, ADS provides a detailed written estimate within 48 hours.

Who actually swings the hammers — your crew or subs?

A good answer

Ask who will be in your home each day and who is accountable for the result. A good answer names an in-house crew or long-term subcontractors with clear oversight. You should not have to manage handoffs between unfamiliar teams.

How ADS answers

ADS uses one in-house crew, with zero subcontractor handoffs.

Are you licensed and insured — and will you show the certificates?

A good answer

A solid contractor can show current licensing and insurance documentation without being asked twice. Review both before work begins, not after a problem appears.

How ADS answers

ADS is Licensed & Insured, and we show certificates before work starts.

What warranty do you put in writing, and what does it cover?

A good answer

Ask for a defined term that covers workmanship and appears in the contract. A verbal promise is hard to rely on once the final payment has been made.

How ADS answers

ADS includes a 2-Year Workmanship Warranty in writing.

Who pulls the permits?

A good answer

The contractor should pull required permits in their own name and coordinate the process. Be cautious if you are asked to pull permits yourself for work the contractor is performing.

How ADS answers

ADS pulls permits ourselves.

What is the payment schedule?

A good answer

A reasonable schedule ties staged payments to visible project milestones, with a modest deposit at the start. Be wary of requests for a large amount of cash up front.

How ADS answers

ADS outlines milestone-based payments in the written contract.

How will you protect the house — dust, floors, daily cleanup?

A good answer

Ask about containment walls, floor protection, and end-of-day cleanup before demo begins. These should be routine jobsite practices, not extras that appear only after you complain.

How ADS answers

ADS covers floors, uses dust containment, and sweeps the site every evening.

Is the timeline in the contract, and what happens if it slips?

A good answer

A good agreement includes a written schedule and a clear plan for proactive communication if conditions change. You should know who is responsible for keeping work moving.

How ADS answers

ADS provides a written schedule and one crew, with no waiting on a subcontractor who never shows.

How are surprises priced once walls are open?

A good answer

Unexpected conditions happen in remodeling. The important part is that change orders are written, priced, and approved before the additional work happens.

How ADS answers

ADS puts change orders in writing and gets your approval first.

Can I see recent local work and reviews?

A good answer

Ask for local addresses, recent project photos, and public reviews you can read yourself. Recent work makes it easier to judge the contractor's consistency and communication.

How ADS answers

ADS has remodeled 100+ rooms across 24 Chicagoland suburbs and holds 5.0 stars across 35+ Google reviews. See our portfolio.

+ Free estimate

Ask us all ten. We like these questions.

Start with a free in-home estimate, then receive a detailed written quote within 48 hours.